Bayswater Primary School

Bayswater Primary School Contract Value: $2,000,000 Client: Ministry of Education Project Management:  Jacobs Architect: Constable Hurst Quantity Surveyors: Jacobs Construction Period: 12 Months This project involved the build of a new 4 Single Storey Classroom block and purpose designed Satellite Building for Special Needs children. Both projects were managed to run concurrently with a single…

Details

Massey High School

Massey High School Contract Value: $2,000,000 Client: Massey High School Board of Trustees Project Management:  Milne Architect: Jasmax Quantity Surveyors: Dean & Murray Construction Period: 10 Months   New Jasmax designed 2 Storey, 4 Classroom Arts and Drama Building This high quality project included the demolition of the existing Staff Room block, including asbestos removal,…

Details

Oaklynn Base School

Oaklynn Base School Contract Value: $2,000,000 Client: Ministry of Education Project Management:  MPM Projects Architect: Fat Parrot Quantity Surveyors: Maltby Construction Period: 15 Months New Purpose designed and built special needs classroom block at Oaklynn Base School, new teaching spaces and administration upgrades. Due to the unique requirements of the students, the project has carried…

Details

Lynfield College

Lynfield College Contract Value: $1,400,000 Client: Lynfield Board of Trustees/Lynfield College Project Management:  N Compass Architect: Eclipse Quantity Surveyors: Kingstons Construction Period: November 2015 - June 2016 The scope of work for this job included a new Recording Studio and Band Practice room approximately 200sqm.  The children also get to enjoy 2 new Practice Rooms…

Details

Whangaparaoa School Library

Whangaparaoa School Library Contract Value: $600,000 Client: Ministry of Education/Whangaparaoa School Consultant: Frequency Project Management Architect: Stevenson & Turner Architects Quantity Surveyors: Maltbys Construction Period: January 2016 – June 2016 This was a purpose built new Library. Works included demolition of existing and removal of asbestos. The library has exposed internal trusses.  Large open plan library,…

Details

Woodlands Park School 8 Classrooms

WOODLANDS PARK SCHOOL 8 NEW CLASSROOMS Construction of 8 new MLE Classrooms over 2 levels. External Brickwork, Traydeck midfloor, Large retaining walls, extensive footpaths ramps and walkway structures, and demolition of existing 10 classroom block. Contract Value: $2,200,000.00 Consultant/Architect: Coffey Projects Ltd Client: Ministry of Education Construction Period: January ‐ August 2015

Details

Mt Eden Normal School 4 Classroom

MT EDEN NORMAL SCHOOL 4 NEW CLASSROOMS $1.1M Consultant Coffey Group Client: Ministry of Education QS: BQH Architects: Adams Architects Construction of 4 new MLE Classrooms over 2 levels, with toilet facilities, walkway structures and accessible lift. Extensive site works and temporary access way also constructed. Construction Period: November 2014 – June 2015 Contract Value:…

Details

Green Bay School 12 Classroom

This project involved the refurbishment of Green Bay High School’s F Block (10 classrooms)  Approximately 40% of the contract works related to upgrading the weathertightness of the classroom block which involved Removal of existing Butynol roofing and replacement with new roof trusses, metal roofing and associated works Removal of existing metal cladding above 2m and…

Details

Pinehurst School SC3 Block

PINEHURST SCHOOL NEW SC3 BLOCK Construction of 3 new buildings with a total floor area of 889m2, comprising 8 new teaching spaces, storage areas, 3 offices, student ablutions, teaching and disabled w/c. Concrete floor on polystyrene and volclay. Exterior walls consist of 150 precast panels. Single pitched roof finished with Diamond Styleline on steel purlins.…

Details

Willow Park Administration Re-Build

WILLOW PARK SCHOOL ADMINISTRATION REBUILD New outdoor areas & playground. The site was located within Corran School grounds which meant careful design and implementation of Health & Safety and Traffic Management plans. Contract Value: $1,013,000 Client: Christopher McMurray ‐ Kristoff Pacific Rim Ltd Construction Period: August – January 2011 (6 months)

Details